The Challenge

The project focused on enhancing operational efficiency, accommodating growth, and ensuring compliance with relevant regulations.

Constructing the development on the existing industrial site presented a challenge for our team, with carefully considered planning required to divert and relocate existing services.

The existing site remained in operation throughout the works, with the project executed in two phases.

The design was required to adhere to PERI's global standards, emphasising functionality, aesthetics, and conformity to industrial design principles.

The production facilities encompassed an extensive range of M&E services, including compressed air and dust extract ventilation.

Client: Peri Ltd
Location : Brentwood
Sector: Commercial / Industrial
Architect : HB Architects

The Solution

Our design team carefully planned and executed a successful diversion of existing HV infrastructure and relocated the on-site substation to integrate with the project works.

We adopted a “fabric first” approach, in which windows were specified with very low u-values and air tightness was to a high level for reduced plant sizing. Highly efficient air source heat pumps provide heating and hot water, thereby greatly reducing energy consumption.

This is an exciting time for PERI UK. The re-development is a significant investment by PERI into its Brentwood office and depot.

Alasdair Stables , Managing Director