The project aimed to expand the hotel's capacity while preserving the historical and architectural integrity of the site. The construction of the new annexe, valued at £11,000,000, involved creating a harmonious blend of modern amenities within a structure that complements the ancient aesthetic of the abbey.

The Challenge

Historical Preservation:

Preserving the historical significance of the 12th-century abbey posed a significant challenge. The design had to respect the heritage value of the existing structure while introducing modern facilities. Striking a balance between historical preservation and contemporary functionality required meticulous planning.

Logistics and Coordination:

The construction of a new building within the confines of an operational hotel demanded precise logistics and coordination. Minimising disruptions to the existing services and guest experience during the construction phase was imperative.

Technical Integration:

Implementing state-of-the-art services, including fully air-conditioned rooms, within a structure rooted in history required advanced technical integration. Ensuring that the new facilities met contemporary standards without compromising the historical aesthetics posed a complex technical challenge. Preserving the historical significance of the 12th-century abbey posed a significant challenge. The design had to respect the heritage value of the existing structure while introducing modern facilities. Striking a balance between historical preservation and contemporary functionality required meticulous planning.

Client: Coomb Abbey
Location : Coventry
Sector: Leisure

The Solution

Heritage-sensitive Design:

Our team engaged in extensive research to understand the historical context of the abbey. The design incorporated elements that respected the heritage of the site, such as using materials that matched the existing structure and replicating architectural features in the new annexe. This approach ensured that the new block seamlessly blended with the abbey.

Phased Construction and Planning:

To minimise disruptions to the hotel's operations, the construction was meticulously planned and executed in phases. Temporary facilities were set up to accommodate guests during critical construction periods. This phased approach ensured that the hotel remained fully operational throughout the project.

Advanced Technology Integration:

Implementing fully air-conditioned rooms and other modern amenities required cutting-edge technology. Our team employed the latest HVAC systems and energy-efficient solutions to meet contemporary standards while maintaining the visual and historical integrity of the abbey.

In conclusion, the successful completion of the project not only added a new dimension to the hotel but also showcased the effectiveness of a holistic and collaborative approach. Overcoming the challenges of historical preservation, architectural harmony, logistical complexity, and technical integration, the new 40-bedroom block stands as a testament to the seamless fusion of history and modernity. The project not only expanded the hotel's capacity but also enhanced its appeal as a destination that seamlessly marries tradition with luxury.